5G Networks Status Page - REF: CHN-3442 - 5GN Planned Maintenance Notification - 24/09/2022 – Maintenance details

All systems operational

SEP23

REF: CHN-3442 - 5GN Planned Maintenance Notification - 24/09/2022

CompletedSeptember 23, 2022 at 22:00 – September 24, 2022 at 02:00UTC

Affects

Updates
  • Planned
    September 23, 2022 at 22:00UTC
    Planned
    September 23, 2022 at 22:00UTC

    Change Description: 5GN planned maintenance work Change Ticket Number: CHN-3442 Change Start Time: 24/09/2022 08:00 AM AEST Change End Time: 24/09/2022 12:00 PM AEST Expected Impact: No Impact – Hazard Condition Only Services Affected: Hazard condition - services connected to 5GN Brisbane Data Centre (BDC) Locations Affected: Brisbane Data Centre (BDC) As part of our comprehensive maintenance program, 5G Networks has scheduled a planned maintenance window to perform generator load testing(Dark Site Test) at Brisbane Data Centre (BDC) This activity has been planned to ensure the highest operational standards are maintained and to minimize the risk of disruption to your operational environment. This activity involves simulating a mains failure(main will be available at all times) in order to test the automation of the UPS and generator infrastructure. Whilst site is confirmed to be stable on EPG (Emergency Power Generator) supply, various maintenance inspections will be carried out before returning site back to Utility supply. 5GN Service Management team, Facility Management and specialist vendors will monitor the health of services throughout the change window. Should you have any questions or concerns regarding this upcoming maintenance, please contact our Change Management team at [email protected] or technical support team via support channel.